Once construction is finished, the design drawings no longer tell the whole story. Pipes get shifted to avoid conflicts, grades are adjusted in the field and structures end up a few feet from where they were planned. An as-built survey records what was actually built, and the as-built drawing is the document owners, engineers and municipalities rely on from that point forward.
Why As-Built Drawings Matter
- Approvals and close-out: many municipalities require as-builts before issuing a certificate of occupancy or accepting public infrastructure.
- Bond release: developers often need approved as-builts to release performance bonds.
- Future work: accurate locations and elevations of utilities prevent costly surprises during repairs and expansions.
- Verification: comparing built conditions with the design shows whether grades, slopes and detention volumes meet the approved plans.
What an As-Built Drawing Typically Includes
- Building footprints and finished floor elevations
- Storm and sanitary structures with rim and invert elevations, pipe sizes, materials and slopes
- Water lines, valves, hydrants and meters
- Pavement, curbs, sidewalks and parking layout
- Finished grade spot elevations and contours where required
- Detention or retention ponds with volume verification
- Comparison of design and as-built values where the reviewing agency asks for it
Our Drafting Process
- Start from the approved design so the as-built follows the same layout, sheet order and naming.
- Import the as-built field data with your description keys and field codes.
- Update linework and structures to their surveyed locations, and recompute pipe lengths and slopes from the measured inverts.
- Show design and as-built values side by side when required, typically with the design value struck through or shown in a table.
- Flag differences that exceed tolerance so the engineer can review them before submittal.
Tips for a Smooth Review
Follow the reviewing agency's as-built checklist exactly, keep the as-built clouding and notes consistent across sheets, and confirm the datum and benchmark match the design plans. Most rejected as-builts come down to missing invert data or unclear labeling, not survey accuracy.